VEL's Grid Automation
Solutions for proving the station before the outage
We help utilities, OEMs, and integrators exercise IEC 61850 and IEC 60870-5-104 paths with simulation that behaves like the bay — not a slide deck.
Where we fit
Work that shows up on the floor
-
Factory acceptance
Stand up SCD-derived IEDs early so gateway mapping, reporting, and IOA tables can be validated before site mobilization.
-
Commissioning readiness
Rehearse closed-loop alarm and indication sequences against a live 104 master path — with timeouts and restores that match field discipline.
-
Remote client access
Publish station IPs with VIP and port 102 workflows so external SCADA clients can online-read and own reporting when required.
-
Signal List alignment
Import Excel maps, resolve Logical Node forms to MMS objects, and keep CLT scoped to the correct IED — not a look-alike point elsewhere in the SCD.
Platform
Powered by NetWise — GridWise on the way
Solutions run on NetWise Station Sim today — Station, Signal List, IEC870, and Events in one file. GridWise SCADA is next, for the operational side of the same station story.
Explore NetWiseDescribe the station you need to prove
Share protocols, timeline, and constraints. We reply with a concrete next step.